forked from haiwan/sledge
You can not select more than 25 topics
Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.
Sean McBride
86b1a274e9
|
4 years ago | |
---|---|---|
.. | ||
.gitignore | 4 years ago | |
README.md | 4 years ago | |
backend.sh | 4 years ago | |
client.sh | 4 years ago | |
debug.sh | 4 years ago | |
fix_results.sh | 4 years ago | |
perf.sh | 4 years ago | |
run.sh | 4 years ago | |
run_relative.sh | 4 years ago | |
scratch.txt | 4 years ago | |
spec.json | 4 years ago |
README.md
Preemption
Question
- How do mixed criticality workloads perform under the Sledge scheduler policies?
- How does the latency of a high criticality workload that triggers preemption on a system under load compare to being the only workload on the system?
- What is the slowdown on the low priority workload?
- How does this affect aggregate throughput?
Setup
The system is configured with admission control disabled.
The driver script drives a bimodal distribution of long-running low-priority and short-running high-priority workloads
Relative Deadlines are tuned such that the scheduler should always preempt the low-priority workload for the high-priority workload.
A driver script runs the two workloads separately as a baseline
It then runs them concurrently, starting the low-priority long-running workload first such that the system begins execution and accumulates requests in the data structures. The high-priority short-running workload then begins.
Independent Variable
The Scheduling Policy: EDF versus FIFO
Dependent Variables
Latency of high priority workload