You can not select more than 25 topics Topics must start with a letter or number, can include dashes ('-') and can be up to 35 characters long.

16 lines
705 B

# Bimodal Distribution
This experiment drives a bimodal distribution of long-running low-priority and short-running high-priority workloads
Relative Deadlines are tuned such that the scheduler should always preempt the low-priority workload for the high-priority workload if preemption is disabled.
The two workloads are run separately as a baseline. They are then run concurrently, starting the low-priority long-running workload first such that the system begins execution and accumulates requests in the data structures. The high-priority short-running workload then begins.
## Independent Variable
The Scheduling Policy: EDF versus FIFO
## Dependent Variables
Latency of high priority workload